Saturday, June 27, 2015

CHAPTER TWENTY TWO .. WE JUST MIGHT MAKE IT!!!

It's beginning to look like they just might have this place finished by the 3oth after all!!!  These pics were taken Thursday, the 25th ..



The first thing we noticed was that the outdoor lights on the front of the garage and the porch were installed!! 




We have door knobs and locks at last!!!  




The railing, ceiling and fan are installed on the deck!!!  





Countertop and kitchen sink are on in the kitchen!!  Whoops .. the appliances are white and we ordered black!!!  I sent Tim a text message and he called me back and promised the appliances would be changed out Friday!! 






Master Bath .. the flange  for the stool has been moved and faucets and lights are installed!!  




Hardwood and trim is all down in the great room .. 




Notice the grids are in the windows finally .. Yayyyyyyy!!! 








Basement Bath .. stool is in ..tile installed on the front of the tub .. but still no vanity.  I'm not crazy about the tile on the tub .. looks too much like the vinyl on the floor .. but  that's my fault .. I chose  it!!! 






 Discovered a hole leading outside to the right of the basement bathroom .. they'll have to take care of that!!!






Rain gutters are up .. downspouts not finished yet. 







They are supposed to put a door on the shower with rubbed bronze trim to match the faucets. 








The hall Bath!! 

That's it for this trip!!  We were told the Hopkins crew would be installing the carpet in the bedrooms Friday.  And since the knobs and locks are installed on the outside doors we will be able to move stuff to the basement Sunday .. Yayyyyyyyyy!!!!!  Ashley called and said we could come to the office and get a set of keys .. we went to pick them up yesterday and guess what??????  Wrong keys and she didn't have another set there .. LOL!!!  Going in sometime today to pick up what we hope will be the right set!!! She also told us the appliances had been switched and we now have our black appliances!!